Pavement Management Training Level 2 (April 13 - 16, 2026)

PAVER training sessions are offered at three levels:
Level 2 goes in-depth into Inventory, Work History, Condition Forcasting and Work planning part 1

It is recommended for those with network definition and PCI experience or those who participated in an earlier course.

Date/Time:   April 13 - 16, - 11 am to 1:50 pm MDT

The PAVER Training Center offers a four-day workshop on Using PAVER for Pavement Management.  This course provides an Intermediate level training on Inventory Tools, Work History, Condition Forcasting and Work planning.  It covers how to use the advanced inventory tools and work history tools and how to create and run work plans

 

Workshop Format:

4 days online presentations and discussions

Each day is a 3 hour Zoom meeting.

 

Certification: Participants who successfully complete the course will receive a certification Completion and 1.2 Continuing Education Units from Colorado State University.

 

Please note: The Center reserves the right to cancel the course at least 7 days prior to the event if the minimum participant number is not met.

 

Cancellation Policy: Cancellation requests must be made in writing and received by the Center no later than seven (7) days before the date of the training in order to receive a refund (less a $30 cancellation fee).  No refunds will be issued after this date.

 

Level 2 tentative agenda

    • Reports
      • Query Tool (Data Selection Criterion)
      • User Defined Reports
    • Inspection - Advanced
      • Frame Inspection
      • Inspection Data Export and Import Wizards
      • Inspection Report/Forms/Setup Wizard
    • Condition Tools
      • Selecting Conditions
      • Defining Condition Categories
      • Work History - Advanced
        • Work Entry Wizard
        • Add Work History from GIS/Tabular Data
        • Work History GIS Views
      • PCI vs Age Family Models
        • Development of PCI vs Age family models
        • Models Start and Acceleration points
        • Assignement of Models to Sections
        • Section Condition Prediction
      • Condition Analysis
        • Algorithm
        • Report Viewer
    • Inventory - Advanced
      • Adding Surface Type and Branch Use
      • User Defines Fields
      • Create a New Pavement Database from GIS/ Tabular Data
      • Add Inventory from GIS/Tabular Data
      • Update Inventory from GIS/Tabular Data
      • Import Inventory Samples from GIS/Tabular Data
    • Work Planning - Localized Maintenance Consequences
      • Distress Maintenance Policies
      • Analysis of Distress Policy Consequences
    • Database Management
    • Database Combine
    • Database Export (Split) Options
    • Database Properties
    • User Preferences (PAVER Defaults)
Fields with asterisk are required.
$750.00